Road · Nasarawa
Keffi-Mararaba Road
Road between Keffi and Mararaba on the Abuja approach, built by China Harbour. The Works Minister found it technically complete in June 2026 and ready for commissioning.
- 43.65 km

Road · Nasarawa
Road between Keffi and Mararaba on the Abuja approach, built by China Harbour. The Works Minister found it technically complete in June 2026 and ready for commissioning.
Road · Nasarawa
A bypass on the Makurdi-Numan road that takes through traffic out of Lafia town. China Harbour has finished the main construction.
Road · Kogi, Edo
The Lokoja-Benin road is being dualised in continuously reinforced concrete, flagged off in February 2025 after earlier contracts were terminated for non-performance.
Road · Abuja, FCT
One of the Federal Capital Territory projects commissioned around the President's third anniversary, with the promise to end the era of abandoned projects.
Rail · Abuja, FCT
The Abuja light rail had been shut since 2020. The FCT Administration rehabilitated it, and President Tinubu relaunched it for commercial service on 29 May 2024 with free rides extended to the end of the year. It links the Central Area to the Nnamdi Azikiwe International Airport.
Bridge · Nasarawa
Built by Nasarawa State and commissioned by the President on his first working visit to the state, in June 2025. It is named the Asiwaju Bola Ahmed Tinubu Interchange. The governor said the contractors were paid in full without borrowing.
Commissioned by the President · State House ↗
Road · Abuja, FCT
Stalled for 16 years, the road was taken from the original contractor and re-awarded to SCC Nigeria under this administration. It gives commuters from Nasarawa an alternative to the Nyanya-Mararaba gridlock.
Road · Abuja, FCT
Highway FCT 105, a long-stalled road to Kuje Township Junction, revived and completed by Arab Contractors. The Vice President commissioned it for the President on 11 June 2026, during the third-anniversary projects.
Road · Abuja, FCT
The first phase of the dual carriageway between two FCT area councils, awarded in February 2025 and commissioned by the Vice President for the President. The remaining six kilometres are expected by December 2026.
Road · Abuja, FCT
The section of Obafemi Awolowo Way from Life Camp Junction to Ring Road 3, built by Julius Berger and commissioned in June 2026. It improves links between Dape, Karmo, Gwarinpa, Kado, Idu and Mbora, with direct access to the Idu industrial district.
Health · Abuja, FCT
A two-storey specialist building at the Federal Medical Centre, with ophthalmology and ENT departments, commissioned on 29 May 2026.
Energy · Kogi, Abuja, Kaduna, Kano
The pipeline meant to carry gas to power plants and industry in the north. NNPC reported the main line welded, including the River Niger crossing, in December 2025, with first gas to Abuja still to be confirmed.
Housing · Abuja, FCT
The flagship of the Renewed Hope housing programme. The President broke ground in February 2024, and the Housing Ministry named it among the projects to finish first in 2026.
Housing · Nationwide
Social housing for victims of insecurity and other vulnerable people. A presidential aide said in July 2026 that construction had begun and allocations had been made.
Energy · Niger
Nigeria's largest hydropower plant, inherited by this administration and handed to its concessionaire, Penstock, in 2024. It was sending about 350 MW to the grid in October 2026, and the regulator is working to bring it to full output.
Energy · Gwagwalada, Abuja
An NNPC gas plant tied to the AKK pipeline, with the President's groundbreaking in August 2023. The grid company inspected the site in 2026 to plan its connection, with commissioning targeted for December 2026.
Energy · Kogi
Eleven solar hybrid mini-grids completed by the Rural Electrification Agency, including Emewe Efopa and Offa, with World Bank backing. Construction of a 20 MW mini-grid at Egume has also been flagged off.
Water · Abuja, FCT
Loops 1, 2, 5 and 6 of the capital's water network, built by the FCT Administration and commissioned by the President on Airport Road in June 2025. He called water a basic human right, not a luxury.
Water · Karu, Orozo, Jikwoyi, Kurudu, FCT
A year after the Greater Abuja network, the water mains were carried out to Karu, Orozo, Jikwoyi, Kurudu and neighbouring satellite towns. The Vice President commissioned it for the President in Kurudu in June 2026, declaring the era of neglect for the satellite towns over.
Civic · Abuja, FCT
Julius Berger's remodelling of the monument at the entrance to the capital, with a water fountain representing the 36 states and the FCT. The First Lady inaugurated it for the President in July 2026, during the third-anniversary projects and the FCT's 50th year.
Road · Nasarawa
A dualised township road and underpass built by the Nasarawa State Government, commissioned for the President in July 2026 at the flag-off of the Akwanga-Jos section of the superhighway. The governor said it was paid for without a bank loan and that everyone whose property was affected was compensated in full.
Commissioned by the President · Federal Ministry of Information, Jul 2026 ↗
Industry · Nasarawa
Nigeria's largest lithium processing plant, owned by Diamond New Energy Company, inaugurated by the Vice President for the President in July 2026. Lithium goes into the batteries of electric vehicles, phones and power storage; the plant is part of the drive to process minerals at home instead of exporting them raw.
Commissioned by the President · THEWILL, Jul 2026 ↗
Industry · Makurdi, Benue
A fruit concentrate factory owned by Bensono Fruits Processing Company, commissioned for the President by his Chief of Staff during Benue's 50th anniversary in June 2026. It gives the state's fruit farmers a ready buyer and cuts post-harvest losses.
Commissioned by the President · Daily Trust, Jun 2026 ↗
Education · Osara, Kogi
A college that trains solar technicians, mini-grid operators, installers and energy auditors, and a green hydrogen research and demonstration plant, both delivered by the Energy Commission of Nigeria. The Vice President commissioned them for the President in August 2026.
Water · Kabba/Bunu, Kogi
A dam for year-round farming and water supply, commissioned by the Minister of Water Resources in February 2024 as part of the state of emergency on food security.
Road · Niger
Failed sections of Section 1, washed-out embankments and a collapsed culvert at Gwada rebuilt as a two-cell box culvert. One of the 260 emergency road interventions ordered by the President; commissioned in January 2026.
Health · Keffi, Nasarawa
Eye, ear-nose-and-throat, dental and physiotherapy clinics under one roof at the Federal Medical Centre, Keffi, commissioned in July 2025 with a solar-powered borehole and a distilled-water generator donated by Japan.
Education · Ilorin, Kwara
A new lecture theatre at the College of Health Sciences and the renovated administrative building, auditorium, Senate chamber and communication faculty, commissioned for the President at the university's 41st convocation in October 2026.
Road · Abuja, Kaduna, Kano
The north's spine road, rebuilt in reinforced concrete after the previous contract was terminated. The first 118 km section took 13 months; another 30.58 km was commissioned in Kano in October 2026, and the President commissioned the new sections at the campaign flag-off in Kaduna. He has directed that the road run on to Mallam Aminu Kano International Airport, with solar street lights along its length.
Road · Katsina to Jigawa
A completed road running from Kwanar Danja in Katsina to Hadejia in Jigawa.
Road · Kano
A dualised road in Kano State, finished and open.
Road · Sokoto, Kebbi (and on to Badagry)
One of the administration's four legacy highways, tying the far north-west to the Atlantic coast. Construction is under way in Sokoto and Kebbi, with the Niger and Kwara sections to follow.
Rail · Kaduna, Kano
The standard gauge line that extends the Abuja-Kaduna railway north to Kano, giving one rail link from Abuja through Kaduna and Zaria to Kano. It was under 30 percent complete in 2023 and is now about 90 percent; the completed 190 km Jaji-Kano stretch is due to be inaugurated on 3 December 2026.
Rail · Kano, Jigawa, Katsina, on to Niger Republic
The rail link from Nigeria to the Republic of Niger, built by Mota-Engil. It was barely started in 2023. An August 2026 joint inspection put the Kano-Katsina section at over 75 percent, with a test run from Kazaure to Katsina, and the 250 km Dawanu-Kano-Kazaure-Daura-Katsina section is due to open with Kaduna-Kano on 3 December 2026. The Katsina-Maradi extension follows by the end of 2027.
Road · Kaduna, Katsina, Zamfara, Sokoto
The interstate corridor across the north-west, moved to concrete pavement in March 2025 so it lasts. Work is under way section by section.
Road · Kaduna
Named in the Works Minister's October 2026 update among the roads completed and ready for commissioning.
Health · Kaduna
A 300-bed hospital at Millennium City, started in 2009 and finished by Kaduna State. The President commissioned it on 19 June 2025 with 100 CNG buses and the Institute of Vocational Training.
Commissioned by the President · Blueprint, Jun 2025 ↗
Health · Katsina
One of the first three federal cancer centres opened in 2025, equipped with TrueBeam radiotherapy.
Health · Zaria, Kaduna
Tests medicines entering Ahmadu Bello University Teaching Hospital against British and US Pharmacopoeia standards. Commissioned on 29 May 2026.
Health · Kano, Katsina, Sokoto
Three centres expanded and re-equipped to run immunisation, surveillance and outbreak response, commissioned on 29 May 2026.
Health · Kano (Gadon Kaya), Delta (Aboh)
Gadon Kaya in Kano and Aboh in Delta were commissioned on 29 May 2026 as examples of the World Bank-supported programme. The Health Ministry reports nearly 3,000 primary health centres revitalised in two years.
Aviation · Kano
The remodelled domestic terminal at Mallam Aminu Kano International Airport, inaugurated by the Aviation Minister in July 2026. The President has also approved N46bn for the airport's second runway.
Road · Kebbi
The President commissioned the dualised bypass in February 2026 with the Bola Ahmed Tinubu Secretariat and the Birnin Kebbi Central Motor Park, all built by Kebbi State.
Commissioned by the President · 21st Century Chronicle, Feb 2026 ↗
Road · Katsina
Commissioned on the President's May 2025 visit, with the state's Agricultural Mechanisation Centre at Dantaba.
Commissioned by the President · Federal Ministry of Information, May 2025 ↗
Housing · Kano
Federal housing in Kano. Phase 1 was reported complete in July 2026, and Phase 2 was about 75 percent done, with roughly 426 units built.
Energy · Kaduna
A plant left stalled for years before this administration resumed work. The Power Minister put it at 87 percent in April 2025. Its latest status should be confirmed with the ministry.
Energy · Kano, Katsina
A new substation at Walalambe and upgrades at Kumbotso, Dakata and the fire-damaged Dan-Agundi in Kano, then a new substation at Kankia in Katsina, all commissioned in one week of October 2026. Walalambe put the Lee Group back on the grid after 30 years off it.
Housing · Igabi, Kaduna
The village struck in error by a military drone in December 2023, rebuilt as the President promised. The Vice President, who carried that promise to the victims, commissioned the new homes, schools and other facilities in January 2026.
Health · Sokoto
Sixteen projects commissioned in May 2025, among them a molecular laboratory, an intensive care unit, a regional drug-dependency treatment centre for women and children, an emergency centre, a psychiatric nursing school and solar power.
Road · Kano
A bypass that takes through traffic between Katsina, Zamfara and the other North-West states around Kano instead of through it, and links ten tertiary institutions. Student leaders toured the works in September 2026.
Education · Afaka, Kaduna
The remodelled Senate Building, with a 60-seat council chamber and full solar backup, and a new Biodiversity and Conservation Centre for the Academy's environmental research. Commissioned in May 2026 among the TETFund projects marking the third anniversary.
Road · Kano to Borno corridor
A completed section of the Kano-Maiduguri highway, per the Works Minister's October 2026 update.
Road · Gombe, Yobe
Rehabilitation of the Gombe-Potiskum road, completed.
Road · Bauchi, Jigawa
A completed road linking Jigawa and Bauchi States.
Road · Nasarawa, Plateau, Bauchi, Gombe, Borno
A legacy highway linking the north-east and north-central zones along one dualised route. The 125 km Akwanga-Jos section through Nasarawa, Kaduna and Plateau was flagged off for the President in July 2026, and work has started on Gombe-Biu.
Health · Maiduguri, Borno
A specialist centre for psychological and drug-related conditions at the University of Maiduguri Teaching Hospital, commissioned on 29 May 2026.
Health · Bauchi
An assisted reproductive technology centre at Abubakar Tafawa Balewa University Teaching Hospital, among the third-anniversary health projects.
Aviation · Borno
The international terminal at Muhammadu Buhari International Airport, commissioned on the President's December 2025 visit to Borno.
Commissioned by the President · Federal Ministry of Information, Dec 2025 ↗
Education · Maiduguri, Borno
Three mega schools from the state's 104-school programme, commissioned on the President's visit with 620 electric vehicles and tricycles.
Commissioned by the President · Federal Ministry of Information, Dec 2025 ↗
Road · Yola, Adamawa
The expanded road and underpass were commissioned on the President's first official visit to Adamawa in February 2026, with a model school and a new High Court complex.
Commissioned by the President · Adamawa State Government, Feb 2026 ↗
Housing · Yobe, Gombe, and states nationwide
Estates with roads, water and lighting, under way in Sokoto, Gombe, Yobe, Katsina, Nasarawa and Benue, per the Housing Ministry, with others in the south.
Energy · Borno
Built by NNPC and inaugurated in 2023. This administration approved N68bn in operating support to keep power flowing to Maiduguri.
Energy · Taraba
After Nigeria's win in a long arbitration dispute, the Federal Government opened talks with Energy China on delivering the project in phases.
Water · Bade, Yobe
Four solar-powered borehole systems, a treatment plant and ground and elevated storage serving Gashua and nearby communities, commissioned by the Minister of Water Resources in May 2025.
Health · Bauchi (ATBUTH), Ibadan and nationwide
Ten radiodiagnostic centres and three cancer centres completed with MedSafe and the Nigeria Sovereign Investment Authority. The Health Minister commissioned the Bauchi centre at ATBUTH in October 2026, with Ibadan next, and called it the largest expansion of health infrastructure and equipment in Nigeria's history.
Road · Delta and Anambra
Dualised approach roads on both banks of the bridge. President Tinubu inaugurated the Delta-side road, linking Asaba to the bridge, on 24 March 2025, with the Anambra side following.
Road · Enugu, Anambra
The anchor roads of a zone-wide programme that also covers Onitsha-Owerri and Enugu-Abakaliki.
Bridge · Enugu
A flyover on the Enugu-Abakaliki expressway, opened to traffic in April 2026.
Bridge · Enugu
The 1978 bridge on the Enugu-Port Harcourt Expressway at New Artisan Market collapsed in September 2023, cutting the main road between the two cities. The federal government demolished and rebuilt it in three 25-metre spans; Enugu West's senator says it was fixed in record time.
Road · Cross River, Ebonyi, Benue, on to Abuja
One of the four legacy highways, carrying the Lagos-Calabar coast north towards the capital. The Works Minister put Section One in Ebonyi at about 45 percent in August 2026, and Section Two runs on into Benue.
Bridge · Onitsha, Anambra to Asaba, Delta
Closed on 7 September 2026 for emergency repairs, including vandalised expansion joints, and reopened to traffic in October after about 38 days. The minister said some of the work remains to be finished.
Road · Imo
The President commissioned the reconstructed dual carriageway and the Assumpta Flyover in Owerri on 30 September 2025, with the 6,000-seat Emmanuel Iwuanyanwu International Conference Centre.
Commissioned by the President · NAN, Sep 2025 ↗
Health · Enugu
The University of Nigeria Teaching Hospital's cancer centre, one of the first three federal centres opened in 2025, with equipment procured through the Nigeria Sovereign Investment Authority.
Health · Ituku-Ozalla, Enugu
A new administrative complex at the University of Nigeria Teaching Hospital, commissioned on 29 May 2026 in a hybrid virtual ceremony.
Energy · Aba, Abia
Nigeria's first ring-fenced power plant and distribution network, built to give businesses and homes across nine local governments around Aba steady electricity. The Vice President commissioned it for the President in February 2024 and opened three Aba roads for the governor the same day.
Commissioned by the President · Federal Ministry of Information, Feb 2024 ↗
Civic · Umuahia and Aba, Abia
The remodelled auditorium in Umuahia, left dilapidated for years, and seven rebuilt roads in Aba, Port Harcourt Road among them. Commissioned for the President by the Works Minister in October 2025.
Commissioned by the President · Federal Ministry of Information, Oct 2025 ↗
Education · Enugu
On his January 2025 visit the President commissioned the first 30 of 260 Smart Green Schools and 60 of 260 Type 2 primary health centres the state is building, one per ward, with the Enugu International Conference Centre, 90 city roads and a command-and-control centre with 150 patrol vehicles.
Commissioned by the President · Federal Ministry of Information, Jan 2025 ↗
Education · Awka and Nnewi, Anambra
Six projects commissioned for the President at the university's 19th convocation in March 2025, including a 700-seat auditorium, a student hostel, staff offices at the College of Medicine in Nnewi and a TETFund environmental management laboratory.
Aviation · Onueke, Ebonyi
Regulators closed the airport because its runway had been built in concrete. The state rebuilt it with the President's support, and the First Lady commissioned the new runway in November 2024.
Road · Rivers
The road and bridges across the Opobo Channel that connect Bonny Island by land to the rest of Rivers State. Julius Berger completed it in June 2026, with the President present when it first opened to traffic in December 2025.
Energy · Bayelsa
Commissioned by the President on his April 2026 visit to Yenagoa, with the 630 m bridge across the River Nun and the Yenagoa-Gbarantoru dual carriageway.
Commissioned by the President · State House ↗
Health · Akwa Ibom
A two-storey complex with laboratories, seminar rooms, a library, call rooms and staff offices, commissioned on 29 May 2026 as part of the third-anniversary health projects.
Rail · Rivers, Abia
The rebuilt first segment of the Port Harcourt-Maiduguri narrow gauge line. Passenger trains started running on 1 May 2024, with the line to be extended from Aba towards Enugu and linked to the Onne and Port Harcourt seaports.
Health · Benin City, Edo
The third federal cancer centre, opened in July 2025. It restored radiotherapy at the University of Benin Teaching Hospital, whose cobalt machine had been out of service for 10 years. The hospital treated over 4,300 cancer patients in 2024.
Energy · Oyigbo, Rivers
A private plant by Sahara Power Group and Crescendough, built in 16 months and inaugurated virtually by the President on 4 June 2025.
Commissioned by the President · Freelanews, Jun 2025 ↗
Road · Edo, Delta
The busy link between the west and the east is being rebuilt in concrete under Operation Rescue, launched by the Works Ministry.
Road · Rivers
Reconstruction of the Eleme-Onne axis, the stretch of the Niger Delta's main interstate road that serves the Onne seaport. Work was continuing in 2026.
Energy · Rivers
Four solar hybrid mini-grids started in July 2026 under DARES, the $750m programme targeting 1,350 mini-grids nationwide. The Rural Electrification Agency deployed more than 200 in 2025.
Aviation · Uyo, Akwa Ibom
The new international terminal, airport hospital and Ibom Aviation Village, inaugurated by the President on 6 November 2026. He had already approved international flight operations at the governor's request, and on the same visit approved the Ibom Deep Seaport.
Commissioned by the President · Federal Ministry of Information, Nov 2026 ↗
Road · Rivers
A dual carriageway through Ikwerre, Emohua and Ogba/Egbema/Ndoni, along a farming and oil-and-gas corridor to Omoku. Built by the Rivers State Government and inaugurated for the President by the Vice President in August 2026.
Commissioned by the President · Daily Trust, Aug 2026 ↗
Road · Bayelsa
Commissioned by the President in person on his April 2026 visit to Bayelsa, with the Elebele power plant and the Angiama-Oporoma Bridge.
Commissioned by the President · Daily Trust, Apr 2026 ↗
Rail · Lagos
A fully electric mass-transit line built by Lagos State. Phase 1 from Marina to Mile 2 has carried passengers since 4 September 2023, and the Lagos commissioner reported more than six million trips by May 2026. Phase 2 is extending it to Okokomaiko, targeted for the first quarter of 2027.
Rail · Lagos, Ogun
Lagos State's second intra-city rail line, run on the Nigerian Railway Corporation's Lagos-Ibadan corridor. President Tinubu inaugurated the first phase at Ikeja station on 29 February 2024. It runs from Agbado to Oyingbo, with eight stations.
Commissioned by the President · Nairametrics, Feb 2024 ↗
Bridge · Lagos
The Federal Ministry of Works began repairs to Lagos's longest bridge on 6 November 2023 and reopened it to traffic on 4 April 2024. President Tinubu inaugurated the refurbished bridge in May 2024, with the Apapa-Oworonshoki expressway.
Road · Lagos
The road serving the Lekki Deep Sea Port, commissioned by the President in June 2025, when he also flagged off further Lagos road projects. The photos show the port it connects.
Road · Lagos, then east to Calabar
The 750 km coastal superhighway that runs through the south-west and south-south. The President commissioned the first 30 km of Section I in May 2025. The Works Minister's October 2026 update puts Section I at 47 km complete, with Section II nearing completion.
Road · Lagos
The reconstructed expressway that links the Apapa and Tin Can Island ports to the rest of Lagos, built under the tax credit scheme and commissioned by the President.
Aviation · Ogun
Commissioned by the President on 4 April 2026. A state project, opened using federal allocation.
Commissioned by the President · Newswings ↗
Bridge · Lagos
Commissioned in April 2026 during the President's first official visit to Lagos, with the LAGIS building and the Bola Ahmed Tinubu Administrative Complex.
Commissioned by the President · State House ↗
Road · Lagos, on to Benin, Togo, Ghana, Cote d'Ivoire
A six-lane expressway joining five West African countries, targeted to open in 2030. Nigeria and its four partners launched the corridor's management authority in June 2026.
Road · Lagos
Sections of the corridor towards the Benin Republic border are listed as completed in the Works Minister's October 2026 update.
Road · Ogun
A completed stretch in Ogun, listed with sections of the Lagos-Ibadan and Shagamu-Ore corridors in the Works Minister's October 2026 update.
Bridge · Lagos
A five-span bridge at Apapa, listed among the completed bridges.
Aviation · Lagos
The Murtala Muhammed International Airport terminal is being stripped back and rebuilt, with a new road to the departures level. The Federal Executive Council approved the funds in August 2025, on a 22-month programme.
Bridge · Okeyinmi, Ado-Ekiti
Ekiti's second flyover, built by the state and commissioned by the Vice President for the President on 9 June 2026.
Commissioned by the President · Federal Ministry of Information, Jun 2026 ↗
Health · Oshodi, Lagos
The first completed hub in the national vaccine supply chain, serving the South-West and South-South. Commissioned on 29 May 2026 at the Federal Medical Stores.
Housing · Lagos
The Housing Minister put the project at 80 percent in August 2025, with more than 700 first-phase homes ready for commissioning.
Energy · Abeokuta, Ayede-Ibadan, Offa, Onitsha, Sokoto
The Siemens Energy programme to expand the grid. The 480 MW New Abeokuta substation was on schedule in April 2026 for commissioning in December, leading a first batch of five sites. The pilot phase delivered 10 mobile substations and 10 transformers.
Road · Lagos, Ogun, Oyo
The rebuild of the country's busiest highway, inherited by this administration, which the Works Minister listed as completed in his May 2025 briefing.
Energy · Lagos
A new gas-insulated substation at Apapa, built with Japanese development assistance to replace one from 1985, and an upgraded substation at Ijora, commissioned by the Power Minister in August 2026. They strengthen supply to the ports and the industrial corridor around them.
Education · Ajegunle, Lagos
The regenerated cluster of 16 senior, 15 junior and 5 primary schools where some 20,000 pupils learn, with 19 mini football pitches beside them. Commissioned for the President in April 2026; the state calls it the largest school complex on a single site in sub-Saharan Africa.
Commissioned by the President · Blueprint, Apr 2026 ↗
Bridge · Akure, Ondo
Akure's first flyover, at the Onyearugbulem-Shagari junction with the Akure-Benin expressway, long a point of gridlock and crashes. Begun under the late Governor Akeredolu and finished by his successor, it was commissioned by the Vice President in May 2026 and named after Pa Reuben Fasoranti on his 100th birthday.
Health · Abeokuta, Ogun
Five infrastructure projects at the Federal Medical Centre, Abeokuta, commissioned in May 2025 as part of the upgrade of federal tertiary hospitals.
Security · Lagos
Three new Navy ships commissioned by the President at the International Fleet Review off the Eko Atlantic waterfront in June 2026, the Navy's 70th anniversary. He credited the Navy's operations against crude oil theft and piracy with higher oil output and revenue.
Energy · Lagos, Abuja, Owerri
Four compressed natural gas projects backed by the Midstream and Downstream Gas Infrastructure Fund, commissioned by the President on 29 May 2026, among them the refuelling station at Ojota in Lagos and a booster station at Jahi in Abuja. Cheaper gas for buses and cars is the alternative to petrol.